Paderborn

Dismantling and moving out of a 25,000 PET bottle / h Aseptic line. Packing and loading for transport to Iran. A challenge at this project was the difficult accessibility. The moving out of the big parts was done by a 200to crane.

We have performed the following works:

  • Wiring of the machines
  • Packing of all components
  • Piping
  • Central lubrication system
  • Survey of spare parts