Paderborn
Dismantling and moving out of a 25,000 PET bottle / h Aseptic line. Packing and loading for transport to Iran. A challenge at this project was the difficult accessibility. The moving out of the big parts was done by a 200to crane.
We have performed the following works:
- Wiring of the machines
- Packing of all components
- Piping
- Central lubrication system
- Survey of spare parts