Kulmbacher Brauerei

Turnkey including the following services:
Relocation of a complete high-performance palletizing. Reconnection to the line. The challenge was that only 10 days were free of production. Drink Getränkemaschinen supplied 50m of crate conveyors. The installation went into operation on schedule.

We have performed the following works:

  • Wiring of the machines
  • Packing of all components
  • Piping
  • Central lubrication system
  • Survey of spare parts